The Heating System.
The heating in the building was supplied by 3 CR Rehema Gas 310 Eco pro boilers which each have a rating of 1590kW. Heating comes on at 5am each morning and operates until the office closes at 5.30pm. The offices are shut at weekends and reopen at 8am on Monday mornings. The volume of this heating system was 20,000 litres.
The Installation.
Delta-T was installed in the system at a rate of 1 litre Delta-T to 100 litres of system water volume. 200 litres of Delta-T were added to the system between midday and 3pm on Thursday 23rd November 2023. There was no chemical clean up of the system prior to the installation of Delta-T. The installation of Delta-T occurred prior to a week of very cold weather.
The Monitoring.
The system was then monitored using the Guardian System. Guardian is a combination of easy-to-use hardware temperature monitors and a dashboard where data is stored and managed. The use of the Guardian system allows temperatures to be monitored every 20 minutes at Britannia House which produced useful graphs showing how the building heats up and cools down.
SafeSol also installed an on-line camera to allow daily readings to be taken from the building gas meter. This system allows a history of readings to be built up. These reading were taken daily at 10 am. This allowed the gas usage to be calculated.
The gas usage in this building is mainly influenced by the external temperature. (all buildings are subject to population variation) To allow a comparison with previous months to be made, Heating Degree Days were obtained from the Bingley weather station. The gas usage for a period is then divided by the HDD (Heating Degree Days) to allow comparison to be made. This report gives a comparison against the gas usage of December 2023, January 2024 and February 2024 (table 1) with that of the corresponding months of the previous year.
THIS GAVE AN OVERALL SAVING OF 27%